Only 10 ULTIMATE Water Security Packages available this season • First 10 applicants receive a 4th HPZ drill site free — valued at $3,670

— THE ULTIMATE WATER SECURITY PACKAGE
You’re Going to Spend Thousands Drilling. Make Sure It’s Not Wasted.
Our science identifies exactly where to drill before Our Driller ever breaks ground — Our Driller is included as part of your package, from the first desktop study to the day the pump goes in.
- Full-property Desktop Water Study — geophysical, hydrological and satellite data
- Fracture Trace Analysis & ranked HPZs — documented in a Final Report
- Drilling by Our Driller — included, from staking the site to the final pump
- Direct project support throughout — not a call centre
- Unsuccessful Bore Technical Review — if your first bore comes up dry, we review what the drilling revealed and re-rank your remaining sites at no extra cost
- BONUS — first 10 applicants only: a 4th High Probability Zone, fully assessed and ready — a second strong location already identified before the rig ever shows up. Valued at $3,670
Apply for the ULTIMATE Package
10 spots only. We review every application against property size and drilling history before confirming a booking.
No cost to apply. Applying does not guarantee one of the 10 spots — we confirm availability and fit within 2 business days.
*Money-back guarantee applies to Sustainable Water Solutions’ professional and location fees under staged conditions — full terms provided before you book, and drilling costs are not covered.
— THE PROBLEM WITH GUESSING
Drilling on a hunch costs the same as drilling with data.
A dry hole doesn’t just cost the drilling fee — it costs the mobilisation, the downtime, and the season you lose waiting to try again.
$15,000+ per dry hole
Mobilisation, casing, and rig hours are spent whether the bore hits water or not.
Months lost to a second attempt
Re-mobilising a rig, re-permitting, and re-scheduling can push you into the next dry season.
Trucking water isn’t a strategy
It’s a stopgap that eats margin every week the herd depends on it.
Traditional methods miss more than they find
Dowsing, witching, and rule-of-thumb siting carry roughly a 13% success rate.
— THE DIFFERENCE SCIENCE MAKES
13% versus 80%+ isn’t a rounding error. It’s the whole budget.
Geophysical mapping and Fracture Trace Analysis identify High Probability Zones before Our Driller is ever booked — replacing a guess with a ranked, evidence-based site.
— WHAT’S INCLUDED
The full ULTIMATE Water Security Package.
Four stages, one coordinated process — from the first desktop study to the day the pump goes in.
01 — SCIENCE
Desktop Study & Location
- Desktop Water Study using geological, hydrological, and satellite data
- Fracture Trace Analysis (FTA) across your full property
- High Probability Zones (HPZs) identified and ranked
- Detailed Final Report handed to you and to Our Driller
02 — DRILLING
Drilling by Our Driller
- Drilling carried out by Our Driller — included as part of your package
- Drill site staked and briefed against the Final Report
- Casing and depth guidance handed to the rig crew
- Our Driller stays on the job from start to finish
03 — SUPPORT
Through the Whole Process
- Direct line to your project contact, not a call centre
- Progress check-ins before, during, and after the drill
- Unsuccessful Bore Technical Review — if the first bore fails, we review the drilling data and re-rank your remaining sites at no charge
- Full terms of our service assurance provided before you commit
04 — AFTER THE BORE
Once Water Is Struck
- Yield verification against your property’s needs
- Guidance on pump selection and next infrastructure steps
- Documentation for your records and any future works
- Ongoing access to your Sustainable Water Solutions contact
BONUS — first 10 packages only
A 4th High Probability Zone added to your Final Report, free of charge — a second strong location already identified in case your first site doesn't produce.
Valued at $3,670
— FROM THE STATIONS WE’VE WORKED
What Victoria landholders say after the bore is in.
“We’d had a dry hole before, so we were cautious. The Final Report was specific enough that the driller SWS brought in knew exactly where and how deep to go.”
Cattle station operator
“What sold us was how specific the report was. It wasn’t a guess dressed up as science — it was an actual ranked site.”
Property manager
“Having SWS bring their own driller was the part we hadn’t expected. It wasn’t just a report and goodbye.”
Station owner
— FROM THE STATIONS WE’VE WORKED
Frequently asked questions.
What happens if the ranked HPZ site turns up nothing?
The first ranked site failing doesn’t end the process — you get a free technical review of the drilling data and a re-ranked site at no charge. Our full service assurance terms are provided before you commit, so you know exactly what's covered. If you're one of the first 10 applicants, your bonus 4th HPZ is a separate, additional prospective location on top of this — giving you another identified site before the rig ever shows up.
Do you use dowsing or witching?
No. Our location work is based on geological, hydrological, and satellite data, combined with Fracture Trace Analysis, not divining methods.
How is the 80%+ success rate measured?
It reflects the proportion of HPZ sites we rank that go on to produce a usable water supply, based on completed projects to date. We can walk through the detail with you during your application review.
What’s the difference between professional fees and drilling costs?
Professional fees cover our desktop study, field analysis, and coordination work. Drilling costs are paid directly to Our Driller for rig time, casing, and materials, and are contracted separately.
How long does the process take, start to finish?
Timelines vary with property size and driller availability. Your project contact will confirm an estimated schedule once your application is reviewed.
Which parts of Victoria do you cover?
This package is built for Victoria cattle stations with 500 acres or more. If your property falls below that range, get in touch and we’ll advise on fit.
Only 10 packages. Make sure yours isn’t the drill that’s wasted.
Apply now to find out if one of the 10 ULTIMATE Water Security Packages is still available for your station this season.
- ✓ Desktop Water Study + Fracture Trace Analysis
- ✓ Ranked HPZs & Final Report
- ✓ Drilling by Our Driller
- ✓ Unsuccessful Bore Technical Review
- ✓ BONUS: 4th HPZ — $3,670 value
- ✓ Money-Back Guarantee*

